Design and bidding services for the 2018 North and South infrastructure improvement program.

The North Infrastructure Improvement Program include improvements to 5.38 mile of Village streets. The improvements included hot mix asphalt (HMA) resurfacing and HMA pavement reconstruction, Portland Cement Concrete (PCC) patching, PCC reconstruction, watermain replacement, watermain lining, sanitary sewer lining, sanitary sewer replacement, new storm sewers, a detention vault to reduce a localized flooding issue, and sidewalk replacement at intersections.

The South Infrastructure Improvement Program included improvements to 4.5 miles of Village Streets. The improvements included hot mix asphalt (HMA) resurfacing and HMA pavement reconstruction, Portland Cement Concrete (PCC) patching, PCC reconstruction, watermain replacement, sanitary sewer lining, sanitary sewer replacement, storm sewer improvements and sidewalk replacement at intersections.