EXPERIENCE

Terminal 3, Baggage Capacity Upgrade

As part of the Terminal 3 baggage capacity upgrade project, GSG performed a hazardous building materials survey across 552,720 sq. ft. of space, including the basement, ticketing and baggage levels, Concourses G, K, and L, and the mezzanine.

 

Scope of Services

    • Conducted asbestos (ACM), lead-based paint (LBP), universal waste (UW), and chemical storage surveys
    • Performed site reconnaissance to identify and document hazardous materials
    • Inspected suspect ACM, LBP, PCBs, UW, and chemical containers
    • Used XRF analyzer to confirm presence of LBP
    • Collected bulk samples analyzed by an NVLAP-certified lab
    • Delivered detailed reports summarizing findings and field activities in PDF and digital formats
    • Ensured full compliance with all relevant regulations and industry standards

PROJECT OWNER

Chicago Department of Aviation

PROJECT LOCATION

O’Hare International Airport Building 300, Chicago, IL

PROJECT SERVICES

  • Hazardous Materials Building Survey
  • Asbestos-Containing Materials Survey
  • Lead-Based Paint Survey
  • Universal Waste Survey

GSG CONSULTANTS, INC.
CALL US TODAY!

SCHAUMBURG OFFICE

CORPORATE OFFICE
735 Remington Road
Schaumburg, IL 60173

CHICAGO OFFICE

333 N Desplaines Street
Chicago, IL 60661