EXPERIENCE
CCDOTH – Burnham Multimodal Corridor – Bicycle & Pedestrian Bridge
GSG supported the development of a grade-separated bicycle and pedestrian bridge over multiple railroad tracks and Brainard Avenue, linking Metra’s Hegewisch Station with the future Burnham Greenway Trail. The project navigated a complex environment of residential, commercial, and industrial land uses.
Scope of Services
-
- Engineering & environmental studies for optimal path alignment
- Railroad coordination
- Special Waste & Preliminary Environmental Site Assessments (PESA)
- Structural & roadway geotechnical investigations
- Bridge pier and retaining wall analysis
- Wetland delineation
PROJECT OWNER
Cook County Department of Transportation and Highways
PROJECT LOCATION
Brainard and Burnham Avenue, Village of Burnham, IL
PROJECT SERVICES
- Geotechnical Engineering:
- Structural Geotechnical Report Roadway Geotechnical Report
- Environmental Engineering:
- Special Waste Assessment
- PESA
- Natural Resources
- Wetland Delineation
GSG CONSULTANTS, INC.
CALL US TODAY!
SCHAUMBURG OFFICE
CORPORATE OFFICE
735 Remington Road
Schaumburg, IL 60173
CHICAGO OFFICE
333 N Desplaines Street
Chicago, IL 60661
